Landmark transaction: Financing for Wynn Al Marjan Island Completed
Monday 10 de February 2025 / 12:00
2 minutos de lectura
(Las Vegas).-Wynn Resorts, Limited (WYNN) announced that Wynn Al Marjan Island has obtained a $2.4 billion construction facility with a global syndicate of lenders to finance the development of Wynn Al Marjan Island, the first integrated resort in the United Arab Emirates.

Wynn Al Marjan Island is located 50 minutes from Dubai International Airport in the emirate of Ras Al Khaimah. The secured term loan facility, made available to Wynn Al Marjan Island FZ-LLC which is a subsidiary of the 40%-owned joint venture, is denominated in a combination of AED and USD currencies, reflecting the bulk of the expected development expenditures to be incurred in AED. The term of the loan is seven years at a competitive market interest rate and is structured as a delayed draw facility which provides significant financial flexibility to the joint venture partners.
This landmark transaction represents the largest hospitality financing transaction in the history of the United Arab Emirates.
The bank syndicate includes a mix of globally recognized regional and international lenders. Abu Dhabi Commercial Bank PJSC and Deutsche Bank AG acted as Joint Coordinators of the financing. The joint coordinators as well as First Abu Dhabi Bank PJSC, Emirates NBD Capital Limited, and The National Bank of Ras Al Khaimah acted as Initial Mandated Lead Arrangers, Bookrunners and Underwriters, and Sumitomo Mitsui Banking Corporation DIFC Branch, Dubai acted as Lead Arranger. First Abu Dhabi Bank PJSC is acting as Agent and Security Agent for the lenders.
Project construction is proceeding well with 64% of the structural concrete completed up to the 34th floor of the main resort tower and elevator cores extending to the 36th floor. The construction team is completing one floor per week, working toward a topping off in December of this year. In the last 100 days, the resort tower has grown approximately 140 feet.
The resort will offer 1,542 rooms and well-appointed suites. To date, 1,226 guest rooms in the tower structure have been completed, or 80% of the total. The exterior façade window glazing is progressing with 2,840 of 13,734 panels completed, which is more than 20% of the total. Fit out is underway in approximately 1,121 rooms – including walls, floors, and ceilings, as well as all mechanical, electrical, and plumbing services.
In the low-rise portion of the building, the concrete and steel structures are a combined 70% complete. Exterior facades and interior fit out have commenced. Elevator and escalator installation across the property is also progressing.
Overlooking its own beautiful white sand beach with views of the Arabian Gulf and the distant Hajar Mountains, Wynn Resorts is developing the resort in partnership with Marjan and RAK Hospitality Holding. Wynn Design and Development is overseeing all facets of the project’s design and construction.
Wynn Al Marjan Island will have twenty-two restaurants, lounges and bars, as well as a nightclub and beach club. Guests will enjoy a luxury shopping promenade and a signature Wynn spa and salon. There will be an extensive 39,000 square foot poolscape adjacent to the beach. The 145,000 square-foot meetings and events center will include outdoor event terraces and lawns. The theater and a new resident show are also being created specifically for Marjan Island.
Categoría:Reports
Tags: Sin tags
País: United States
Región: North America
Event
Peru Gaming Show 2025
18 de June 2025
Facephi presented its digital identity verification solutions for the online gaming sector in Peru at PGS 2025
(Lima, SoloAzar Exclusive).- Facephi is consolidating its position as a strategic partner for responsible online gaming in Peru, presenting advanced identity verification, fraud prevention, and regulatory compliance solutions at PGS 2025, adapted to an increasingly digital and demanding ecosystem. In this interview, Bruno Rafael Rivadeneyra Sánchez, the firm's Identity Solutions Senior Manager, explores how its technology is redefining gaming security standards, with a preventative, seamless, and 100% regional approach.
Friday 18 Jul 2025 / 12:00
From PGS 2025, Win Systems Redoubles its Commitment to Peru: Innovation, Proximity, and Regional Expansion
(Lima, SoloAzar Exclusive).- In a revealing interview, Galy Olazo, Country Manager of Win Systems in Peru, analyzes the company's strategic role in one of the most thriving markets in the region. Its participation in the PGS 2025 trade show not only left its mark with its technological advances, such as the new Gold Club Colors electronic roulette wheels and the WIGOS management system, but also reaffirmed its commitment to the transformation of the sector and its consolidation in Latin America.
Tuesday 15 Jul 2025 / 12:00
Key debate during PGS 2025: Enforcement: Process to ensure compliance (laws, norms, rules)
(Lima, SoloAzar Exclusive).- During the 2025 edition of the Peru Gaming Show, the conference ‘Enforcement: Process to ensure compliance (laws, norms, rules)’ took place, with an international panel of professionals who debated about the current challenges to combat illegal gaming and guarantee the application of the laws in the sector, both in Peru and in the Latam region.
Monday 14 Jul 2025 / 12:00
SUSCRIBIRSE
Para suscribirse a nuestro newsletter, complete sus datos
Reciba todo el contenido más reciente en su correo electrónico varias veces al mes.