Noticias de ultima
  • 12.00 Colombian Olympic Committee, GAT Expo, and Colombian Official Esports Announce Historic Partnership to Promote Esports as an Olympic Discipline in Colombia
  • 12.00 63 suspicious betting alerts reported by IBIA in Q1 2025
  • 12.00 PAGCOR Q1 shows strong financial performance, net income increases 23%
  • 12.00 GAT Expo 2025: Novelties, technology, innovation, and high-level networking in the magical city of Cartagena
  • 12.00 Harsh sanction: 11 year ban for darts player Andy Jenkins
  • 12.00 Altenar releases Tipster Module to provide influencer advertising option
  • 12.00 Michigan Gaming Control Board Warns CFTC About Risks of Sporting Event Contracts in the State
  • 12.00 CT Interactive Expands Presence in Spain with Casino Pause and Play Integration
  • 12.00 Amusnet Launches New Promotional Tool: Flexibility, Dynamism, and Maximum Player Retention
  • 12.00 Olympian Legends: Galaxsys' New Slot Game Inspired by Ancient Myths
Reports

Landmark transaction: Financing for Wynn Al Marjan Island Completed

Monday 10 de February 2025 / 12:00

2 minutos de lectura

(Las Vegas).-Wynn Resorts, Limited (WYNN) announced that Wynn Al Marjan Island has obtained a $2.4 billion construction facility with a global syndicate of lenders to finance the development of Wynn Al Marjan Island, the first integrated resort in the United Arab Emirates.

Landmark transaction: Financing for Wynn Al Marjan Island Completed

Wynn Al Marjan Island is located 50 minutes from Dubai International Airport in the emirate of Ras Al Khaimah. The secured term loan facility, made available to Wynn Al Marjan Island FZ-LLC which is a subsidiary of the 40%-owned joint venture, is denominated in a combination of AED and USD currencies, reflecting the bulk of the expected development expenditures to be incurred in AED. The term of the loan is seven years at a competitive market interest rate and is structured as a delayed draw facility which provides significant financial flexibility to the joint venture partners.

This landmark transaction represents the largest hospitality financing transaction in the history of the United Arab Emirates.

The bank syndicate includes a mix of globally recognized regional and international lenders. Abu Dhabi Commercial Bank PJSC and Deutsche Bank AG acted as Joint Coordinators of the financing. The joint coordinators as well as First Abu Dhabi Bank PJSC, Emirates NBD Capital Limited, and The National Bank of Ras Al Khaimah acted as Initial Mandated Lead Arrangers, Bookrunners and Underwriters, and Sumitomo Mitsui Banking Corporation DIFC Branch, Dubai acted as Lead Arranger. First Abu Dhabi Bank PJSC is acting as Agent and Security Agent for the lenders.

Project construction is proceeding well with 64% of the structural concrete completed up to the 34th floor of the main resort tower and elevator cores extending to the 36th floor. The construction team is completing one floor per week, working toward a topping off in December of this year. In the last 100 days, the resort tower has grown approximately 140 feet.

The resort will offer 1,542 rooms and well-appointed suites. To date, 1,226 guest rooms in the tower structure have been completed, or 80% of the total. The exterior façade window glazing is progressing with 2,840 of 13,734 panels completed, which is more than 20% of the total. Fit out is underway in approximately 1,121 rooms – including walls, floors, and ceilings, as well as all mechanical, electrical, and plumbing services.

In the low-rise portion of the building, the concrete and steel structures are a combined 70% complete. Exterior facades and interior fit out have commenced. Elevator and escalator installation across the property is also progressing.

Overlooking its own beautiful white sand beach with views of the Arabian Gulf and the distant Hajar Mountains, Wynn Resorts is developing the resort in partnership with Marjan and RAK Hospitality Holding. Wynn Design and Development is overseeing all facets of the project’s design and construction.

Wynn Al Marjan Island will have twenty-two restaurants, lounges and bars, as well as a nightclub and beach club. Guests will enjoy a luxury shopping promenade and a signature Wynn spa and salon. There will be an extensive 39,000 square foot poolscape adjacent to the beach. The 145,000 square-foot meetings and events center will include outdoor event terraces and lawns. The theater and a new resident show are also being created specifically for Marjan Island.

Categoría:Reports

Tags: Sin tags

País: United States

Región: North America

Event

GAT EXPO CARTAGENA 2025

28 de April 2025

Colombian Olympic Committee, GAT Expo, and Colombian Official Esports Announce Historic Partnership to Promote Esports as an Olympic Discipline in Colombia

(Cartagena) - The Colombian Olympic Committee (COC) and GAT Esports have sealed a strategic partnership to promote esports as part of the country's professional sports ecosystem. The announcement was made at a formal ceremony held at the gaming industry products and services exhibition hall, attended by Marco Emilio Hincapié, President of Coljuegos, COC executives, José Aníbal Aguirre, CEO of GAT Esports, media, and special guests.

Wednesday 30 Apr 2025 / 12:00

GAT Expo 2025: Novelties, technology, innovation, and high-level networking in the magical city of Cartagena

(Cartagena, SoloAzar Exclusive).- Today concludes GAT Expo Cartagena 2025, which has taken place this week with the presence of 23 countries and more than 70 international brands in the historic city of Cartagena de Indias, with its cobblestone streets, flower-filled balconies, and centuries-old walls.

Wednesday 30 Apr 2025 / 12:00

Successful Start to GAT Expo Cartagena 2025, Which Continues with Two Days of Gaming Sector Exhibitions

(Cartagena, SoloAzar Exclusive).- Perfect attendance and strong performance were the highlights yesterday at the GAT Academy conference series at the start of GAT EXPO Cartagena, which continues today and tomorrow with the exhibition of products and services from important companies in the gaming sector, both traditional and online.

Tuesday 29 Apr 2025 / 12:00

SUSCRIBIRSE

Para suscribirse a nuestro newsletter, complete sus datos

Reciba todo el contenido más reciente en su correo electrónico varias veces al mes.

PODCAST

MÁS CONTENIDO RELACIONADO